INDUSTRIAL SEWAGE TREATMENT
PLANT SOLUTIONS
Thanks to very high quality components we are able to design and assemble full wastewater treatment systems in many countries around the world.
The vast number of rural settlements and small towns in Poland do not have an orderly wastewater management. The imbalance between the development of water supply and the development of wastewater collection and treatment systems is a huge threat to the environment.
The service of wastewater treatment plant is a service aimed at owners of wastewater treatment plants who do not have professional technological support. Our technology allows you to solve problems of a wastewater treatment plant and ensure a stable ecological effect at low operating costs.
In addition to the comprehensive implementation of the turnkey sewage treatment plant, we supply equipment and equipment for wastewater treatment and water treatment.
We deal with the construction, moderniisation and renovation of industrial plants. Thanks to high quality customer service, wide offer, extensive technical backend and consequences in operation, the quality of our services is constantly increasing. In order to meet the requirements and expectations of clients we realize investments in the construction of sewage treatment plant “turnkey” helping the investor to go through the various stages of the investment.
I hereby confirm that Marex Technology has supplied and installed a wastewater treatment plant with a capacity of 50m3/h at SOMEX in 2014. Marex Technology Equipment has been selected after a thorough analysis of 5 different offers. The existing operation of the equipment confirms the high quality of workmanship, and the extremely effective technical solutions ensure trouble-free and reliable operation.
Our company purchased in October 2014 a new vacuum cleaner with a capacity of 50m3/h, for the treatment of waste water resulting from recycled film. We operate the new vacuum cleaner to this day. Marex Technology has fulfilled its contract for the supply of equipment within the deadline. It carried out the commissioning of the equipment very smoothly and trained the crew for operation, operation and maintenance, demonstrating great professionalism, commitment and solidity.
Our plant operates the PST 2 x 300 worm Press and 2 x 200 in the wastewater treatment plant from 201 L and 2013 R. The impeccable performance of a stainless steel device allows for trouble-free operation, and good structural solutions make the press an easy-to-use device. The existing-failure-free operation allows us to conclude that the worm press fully meets our expectations.